Olympic Green Hockey Field

Venue details

Venue: Beijing Olympic Green Hockey Stadium

Location: Olympic Green

Type: Temporary

Olympic Events: Hockey

Paralympics Events: Football

Floor area: (sq m) 15,539

Temporary seats: 17,000

Groundbreaking date: December 28, 2005


The Beijing Olympic Green Hockey Field is one of nine temporary venues erected for the Games this year, with the 17,000-capacity facility being taken down after the Olympics and Paralympics.

Situated at the northern end of the impressive Olympic Green, the venue is one of 13 built on the site which will host events in what is the heart of the Olympics in Beijing.

The hockey field sits handily placed at the junction of the fifth ring road in Beijing and the Beijing-Changping Expressway.

Like many of the new stadia built of the Olympics the Hockey Field was christened by hosting a warm-up event with an international hockey tournament successfully held in 2007.

Two state-of-the-art hockey pitches have been built, one with 12,000 seats will which will stage the finals, while a second pitch with 5,000 spectators will be used for the preliminaries.

Two gold medals will be on offer at the venue with a 12-team field in the men's event and 10 sides fighting it out for the women's title.

The field takes up an area of 15,546 square metres and after the Olympics it will play host to the five-a-side and seven-a-side tournaments in the Paralympics before it will then be taken down.

Together with the nearby archery field, which is also a temporary structure, the combined 21 hectares will be turned into the Olympic Forest park after the Games as Beijing attempts to promote more of a environmentally friendly outlook with so many doubts over the city's pollution.

Solar energy will also be used to heat the water for the facility, while the air-conditioning system inside the buildings has also been made as ozone-friendly as possible.

The man-made turf covering the pitches has passed the International Hockey Federation's inspection for retaining water despite the arid atmosphere in and around Beijing - which was the biggest challenge for the constructors of the venue.

Now the best hockey facility in the whole of China, which took two years to build, the Hockey Field will enjoy just one summer in the spotlight before being consigned to history.

Advertisement starts


Advertisement

Advertisement ends

Olympics gallery

LONDON - AUGUST 25: Staff from Heathrow Airport applaud double Gold Medalist swimmer, Rebecca Adlington as the Great Britain Olympic team arrive home from the Beijing Olympic Games at Heathrow airport on August 25, 2008 in London, England. The Great Britain Olympic team arrived back at Heathrow Airport from the Beijing games following their most successful performance in the Olympics for 100 years. Great Britain finished fourth in the medal table, winning 47 medals including 19 gold. (Photo by Cate Gillon/ Getty Images)
LONDON - AUGUST 25: Staff from Heathrow Airport applaud double Gold Medalist swimmer, Rebecca...

Win chance to support Team GB

Trip to Vancouver 2010 Winter Olympic Games courtesy of Scottish Widows.

Stadium guides

Take a look behind the scenes at the 2008 venues.

 

Advertisement starts



Advertisement ends

Page Footer


Access keys


You will need to use different key combinations in order to use access keys depending on your internet browser, find out which on our accessibility page.
  • (0) Navigate to Accessibility page.
  • (1) Navigate to Home page.
  • (2) Navigate to My email.
  • (3) Navigate to My Account.
  • (4) Navigate to Site Map page.
  • (5) Navigate to Contact us page.
  • (6) Navigate to Members channel.
  • (7) Navigate to Services channel.
  • (8) Navigate to News & Info channel.
  • (9) Navigate to Entertainment channel.
  • ([) Skip down to the Primary navigation block.
  • (]) Skip down to the more links within this section block.
  • (=) Bypass all navigation and jump to the content.
  • (x) Text only version of this page.